This
will be my 3rd self build so here
we go again.
As i
did not sale the Caravelle i am
going to convert this into a camper.
Having already done 2 before (Tomato
Soup & black
LWB) I must be nuts to undertake
another project. I find it is in
doing the conversion rather than
owning the end product that gives
me the satisfaction.
Anyway as
said, the latest project is a
SWB T4 Caravelle that has covered
quite a few miles (146k) but has
full service history. The van was
an ex airport shuttle and when
purchased had just been through
its first MOT.
Since
the purchase i have removed the
rear seats which have been sold
on. The original front seats have
been retained but now sit on swivel
bases with safe boxes beneath,
these will be retrimmed at a later
date. All the interior panels
have been removed, this is due
to the blue colour of everything,
these are being retrimmed and then
recoloured in either anthracite
or black, this will eventually
include the dash. The engine bay
& wheel arches have been cleaned
down and new solar/security tint
added to the side windows (factory
tint was not dark enough).
Outside
i have added a set of 18" ASA alloys
with 40 profile tyres and a set
of "in-pro" headlights/side indicators,
these may be changed at a later
date for double headlights.
Next step
is to lower the van and purchase
the interiour parts for a camper
conversion, roof is already on
order from "Reimo" so hopefully
the intention is to have something
functional by VANFEST.
07-06-2006 -
Van now lowered and looking a lot
better, 60mm springs and short
shocks all around.
In the
last month all the lower interior
panels have gone to the trimmers
to have grey leather inserts fitted,
this is where, on the original
panels the velour was. Panels have
then been colour coded black to
get away from the hideous blue
plastic that this van came with.
Also purchased is a centre consol
which has been fitted along with
some crystal rear lights
28-07-2006 - I have now started the interior
fit out with the carcase for the
sink, cooker and bed box now basically
finished. I now need to decide
on a colour for the cabinet fronts,
work top & flooring. Cab area is
being left blue for now as i want
to get the rear liveable before
Vanfest.
28-07/05-08 -
Floor has now been fitted and cupboards
are now coming together with some
doors for the bed box fitted. I
will finish off the doors to the
lower portions of the van then
remove work top and bed top
to fit out the gas, water, lighting & power.
After this the worktop will be
covered, hindges fitted to bed/seat
to allow it to convert to a double
bed and the bed legs will be fitted,
most of this i hope to achieve
by Volksfest Wales (20th August).
I will
be fitting a "Reimo" roof but this
will be done after Vanfest as i
do not have the time before. Once
all this is done i will then move
on to the cab area, new seats (or
cover them) head unit, amp, colour
code dash, new carpet etc:
11-08-2006 -
Construction of interior still
taking place, the drawer has now
been constructed for the cabinet
and all doors within the cabin
space have been fitted. Work has
now started in constructing the
various rear compartments to house
the battery, inverter, water containe
and gas cylinder. The lattter will
be in its own sealed compartment
with a drop out vent in the floor
(gas is heavier than air should
there be a leak). Cardboard templates
were made for the awkward panels
before cutting.
19-08-2006 -
Constructed the rear doors for
access to battery, water etc: Also
fitted front door cards. Started
to run some cables for lighting
but cannot do much more on this
until the roof has been fitted.
This has now arrived from "Reimo"
and will be sent to spray shop
for colour match in a weeks time.
Next step is to cover worktop with
laminate sheet, run gas & water
pipes and start on 240v power.
27-08-2006 -
Carried on with fit out of van,
trying to get it operational for
Vanfest but the days are slipping
by. Have fitted water pump and
lines, gas lines and most of the
cables fir lights etc: but still
a lot to do. It is making it more
awkward as i have still to find
2 clear days to fit the roof. This
will be after Vanfest now as it
is not colour coded yet. I will
have the above finished this weekend
with inverter wired up which means
that i can finally fit the worktop
complete with sink & cooker. This
will be a big step to finiishing
the inside. Also finished the colour
coding of the dash which has now
gone from the factory blue to black,
Matt took about 3 hours just to
do this but it makes one hell of
a difference. Still to go in are
the alarm and ICE then i can concentrate
on front seats, carpet and foam
for the bed, maybe not in that
order.
25.11.04 -
Not done anything on the van
over the past month as i have
had work commitments but as from
this weekend all syatems are
go. The "Reimo" roof
has now been fitted, this was
carried out back in sept/oct
so this can now be trimmed and
finished. Also i have now fitted
a set of Audi seats in grey leather
in the front. This was an easy
custom as the base plates required
drilling and with a very small
modification to the runners they
fitted a treat. Still to finish
is all the 12volt and 240v power/lights
etc and ICE. The exteriour has
to get a few mods but not sure
yet as to how far to go. Rear
end is a little too low and the
60mm springs will be replaced
with 50mm. Thats about it for
now so on with the work.
JANUARY
2007 -
Started work after Christmas,
and am now fitting new amps,
speakers etc: this should be
finished by the first weekend
in January. Also front end is
going to paint shop for some
tarting up. Rear squabs are at
the trimmers to get them finished
off and the carpet has now been
changed from blue and a grey
one fitted to the cab area. Blue
LED lighting has now been added
to parts of the interior, still
more to do, also lights fitted
into the cupboards and 240v from
the inverter is now working.
So here we are at the end of
the first week in January and
all is going well.
Front
headlights have also been changed
as i did not like the last set
so i now have Projectzwo double
headlights with a twist as they
have been modified with Angel Eyes
in them.
February
2007 - Van
has now been raised (still lowered)
with 50mm lowering springs instead
of 60mm, this has made a huge difference
in the comfort of the ride so will
stay with this. Rear squabs are
now trimmed, most of the interior
is finished apart from small trim
bits, no big jobs left, just looking
foward to the show season and a
few trips away. 4000 watts of ICE
is now operatioanal and very pleased
with this so it is just a few small
personalising bits to do.
March
2007 - Side
bars and front push bar have now
been fitted to give it a little
different look to most T4 vans.
These are Stainless steel and were
imported from Holland.
The
rear lights have been changed again
for the latest LED units along
with aftermarket rear fog lights
which all add that personal touch.
Also i have now removed the cat
and centre bow and fitted a stainless
steel exhaust system with twin
boxes and 3" tail pipes.
A
Project Zwo rear door infill has
also been fitted to give a different
look to the rear.
Still
adding little bits but i think
this is about finished so time
to enjoy until someone with a bundle
of notes offers to purchase it
then it will be on with the next.
AFTER WINNING NUMEROUS SHOWS IN 2007
THIS VAN HAS NOW BEEN SOLD TO MAKE WAY FOR A T5